Southern Natural Gas Icon

Outage Impact Report

Southern Natural Gas 2w ago

Source Link

All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.

TSP/TSP Name:  6900518-SOUTHERN NATURAL GAS CO. Critical: Y Notice Type Desc (1):  MAINTENANCE Notice Type Desc (2):  MAINTENANCE Notice Eff Date/Time:  10/29/2026 4:46:01PM Notice End Date/Time:  10/30/2026 9:00:00am Post Date/Time:  10/29/2026 4:46:01 PM Notice ID: 712600 Reqrd Rsp:  1 Rsp Date/Time:  10/29/2026 12:00:00 AM Notice Stat Desc:  INITIATE Prior Notice:  Subject:  Outage Impact Report
Notice Text:

 

 

 

 

 

 

 

 

-Restrictions to Primary In-Path transportation services may be necessary.

 

 

SNG - Outage Impact Report

 

 

 

 

-Restrictions to In-Path transportation services may be necessary.

 

 

Seven Day Forecast (updated 10/29/26)

 

 

 

-Restrictions to Interruptible and Out of Path transportation services may be necessary.

 

 

 

 

 

 

-No anticipated impact to transportation services.

 

 

Station / Seg

 

Est Nominal Design Capacity (Thousand Dth)

Monday (11/2)

Tuesday (11/3)

Wednesday (11/4)

Thursday (11/5)

Friday (11/6)

Saturday (11/7)

Sunday (11/8)

 

 

Primary Outage(s) that may Impact Throughput

Est. Operational Capacity (Operational Impact) - Thousand Dth

 

Onward (segment 30)

 

209

 

209

 

209

 

209

 

209

 

209

 

209

 

209

 

 

Duncanville Lateral (segment 90)

 

36

 

36

 

36

 

36

 

36

 

36

 

36

 

36

 

 

Dearmanville (segment 150)

 

355

 

335

(20)

 

335

(20)

 

335

(20)

 

335

(20)

 

355

 

355

 

355

Bell Mills Compressor Station: Scheduled Unit Maintenance Proj-4500-3 (11/2/2026 - 11/5/2026)

 

 

 

White Castle (segment 340)

 

 

 

798

 

 

 

738

(60)

 

 

 

548

(250)

 

 

 

673

(125)

 

 

 

673

(125)

 

 

 

673

(125)

 

 

 

738

(60)

 

 

 

738

(60)

Shadyside Compressor Station: Scheduled Station Maintenance Proj-5000 (11/3/2026)

Shadyside Compressor Station: Scheduled Unit Maintenance Proj-5000-2 (11/4/2026 - 11/6/2026)

Shadyside Compressor Station: Scheduled Unit Maintenance Proj-5000-4-5 (11/3/2026)

Shadyside Compressor Station: Scheduled Unit Maintenance Proj-5000-5 (11/1/2026 - 11/20/2026)

 

LA West Leg (segment 350)

 

798

 

733

(65)

 

733

(65)

 

733

(65)

 

733

(65)

 

733

(65)

 

733

(65)

 

733

(65)

Franklinton Compressor Station: Scheduled Unit Maintenance Proj-512215 (11/1/2026 - 11/8/2026)

 

Sesh (segment 380)

 

507

 

507

 

507

 

507

 

507

 

507

 

507

 

507

 

 

Gwinville (segment 400)

 

234

 

234

 

234

 

234

 

234

 

234

 

234

 

234

 

 

Bay Springs (segment 420)

 

1,817

 

1702

(115)

 

1702

(115)

 

1702

(115)

 

1702

(115)

 

1702

(115)

 

1702

(115)

 

1702

(115)

Bay Springs Compressor Station: Scheduled Unit Maintenance Proj-5216-1 (11/1/2026 - 3/31/2027)

 

Enterprise (segment 430)

 

2,450

 

2195

(255)

 

2195

(255)

 

2195

(255)

 

2195

(255)

 

2195

(255)

 

2195

(255)

 

2195

(255)

Enterprise Compressor Station: Scheduled Unit Maintenance Proj-5222-15 (11/1/2026 - 11/15/2026)

South Main line east of Enterprise: Unscheduled Pipeline Maintenance - CAO (11/1/2026 - 3/31/2027)

 

York

'ZONE 1/2 BOUNDARY'

(segment 440)

 

2,449

 

2194

(255)

 

2194

(255)

 

2194

(255)

 

2194

(255)

 

2194

(255)

 

2194

(255)

 

2194

(255)

York Compressor Station: Scheduled Unit Maintenance Proj-5230-1 (11/1/2026 - 11/15/2026)

 

Ellerslie (segment 490)

 

1,663

 

1608

(55)

 

1608

(55)

 

1608

(55)

 

1608

(55)

 

1608

(55)

 

1608

(55)

 

1608

(55)

Thomaston Compressor Station: Scheduled Unit Maintenance Proj-5272-5 (11/2/2026 - 12/6/2026)

 

South Atlanta (segment 510)

 

537

 

537

 

537

 

537

 

537

 

537

 

537

 

537

 

 

Thomaston East (segment 530)

 

900

 

900

 

900

 

900

 

900

 

900

 

900

 

900

 

 

Ocmulgee (segment 530)

 

801

 

721

(80)

 

721

(80)

 

721

(80)

 

721

(80)

 

721

(80)

 

721

(80)

 

721

(80)

Ocmulgee Compressor Station: Unscheduled Unit Outage Proj-5277-4 (11/1/2026 - 11/15/2026)

 

South Georgia (segment 650)

 

143

 

143

 

143

 

143

 

143

 

143

 

143

 

143

 

This document is updated on a weekly basis and outage schedules/impacts are subject to change as the week progresses. Dates posted on DART should be deemed correct in the event of conflicts between DART posted dates and dates on this report.

The impacts sheet are based on steady-state hydraulic models assuming recent operating flows, conditions, and various unit outages.


 

 

 

 

-Restrictions to Primary In-Path transportation services may be necessary.

 

SNG - Outage Impact Report

 

 

-Restrictions to In-Path transportation services may be necessary.

 

November 2026 (updated 10/29/26)

 

 

-Restrictions to Interruptible and Out of Path transportation services may be necessary.

-No anticipated impact to transportation services.

 

Station / Seg

 

Est Nominal Design Capacity (Thousand Dth)

Week 1 (11/2 - 11/8)

Week 2 (11/9 - 11/15)

Week 3 (11/16 - 11/22)

Week 4 (11/23 - 11/29)

 

Primary Outage(s)

Est. Operational Capacity (Operational Impact) - Thousand Dth

 

Onward (segment 30)

 

 

209

 

 

 

209

 

 

209

 

 

209

 

 

Duncanville Lateral (segment 90)

 

 

36

 

 

 

36

 

 

36

 

 

36

 

 

Dearmanville (segment 150)

 

 

355

 

 

 

355

 

 

355

 

 

355

 

 

White Castle (segment 340)

 

 

798

 

 

738

(60)

 

738

(60)

 

728

(70)

Shadyside Compressor Station: Scheduled Unit Maintenance, Proj-5000-5 (11/1/2026 - 11/20/2026) White Castle Compressor Station: Scheduled Unit Maintenance, Proj-5010-10 (11/23/2026 - 12/6/2026)

 

Sesh (segment 380)

 

 

507

 

 

 

507

 

 

507

 

 

507

 

 

Gwinville (segment 400)

 

 

234

 

 

63

(171)

 

 

234

 

 

234

Pickens Compressor Station: Scheduled Station Maintenance(valve), Proj-4125 (11/9/2026 - 11/10/2026)

 

Bay Springs (segment 420)

 

 

1,817

 

 

1702

(115)

 

1702

(115)

 

1702

(115)

Bay Springs Compressor Station: Scheduled Unit Maintenance, Proj-5216-1 (11/1/2026 - 3/31/2027)

 

Enterprise (segment 430)

 

 

2,450

 

 

2195

(255)

 

2400

(50)

 

2400

(50)

Enterprise Compressor Station: Scheduled Unit Maintenance, Proj-5222-15 (11/1/2026 - 11/15/2026) South Main line east of Enterprise: Unscheduled Pipeline Maintenance - CAO (11/1/2026 - 3/31/2027)

 

York

'ZONE 1/2 BOUNDARY'

(segment 440)

 

 

2,449

 

 

2194

(255)

 

 

2,449

 

 

2,449

York Compressor Station: Scheduled Unit Maintenance, Proj-5230-1 (11/1/2026 - 11/15/2026)

 

Ellerslie (segment 490)

 

 

1,663

 

 

1608

(55)

 

1608

(55)

 

1608

(55)

Thomaston Compressor Station: Scheduled Unit Maintenance, Proj-5272-5 (11/2/2026 - 12/6/2026)

 

South Atlanta (segment 510)

 

 

537

 

 

 

537

 

 

537

 

 

537

 

 

Thomaston East (segment 530)

 

 

900

 

 

 

900

 

 

900

 

 

900

 

 

Ocmulgee (segment 530)

 

 

801

 

 

721

(80)

 

 

801

 

 

801

Ocmulgee Compressor Station: Unscheduled Unit Outage, Proj-5277-4 (11/1/2026 - 11/15/2026)

 

South Georgia (segment 650)

 

 

143

 

 

 

143

 

 

143

 

 

143

 

This document is updated on a weekly basis and outage schedules/impacts are subject to change as the week progresses.

Dates posted on DART should be deemed correct in the event of conflicts between DART posted dates and dates on this report.

The impacts sheet are based on steady-state hydraulic models assuming recent operating flows, conditions, and various unit outages.

 

 

 

 

 

 

 

 

-Restrictions to Primary In-Path transportation services may be necessary.

 

 

SNG - Outage Impact Report

 

 

-Restrictions to In-Path transportation services may be necessary.

 

December 2026 (updated 10/29/26)

 

 

-Restrictions to Interruptible and Out of Path transportation services may be necessary.

 

 

 

 

-No anticipated impact to transportation services.

 

Station / Seg

 

Est Nominal Design Capacity (Thousand Dth)

Week 1 (11/30 - 12/6)

Week 2 (12/7 - 12/13)

Week 3 (12/14 - 12/20)

Week 4 (12/21 - 12/27)

Week 5 (12/28 - 1/3)

 

Primary Outage(s)

Est. Operational Capacity (Operational Impact) - Thousand Dth

 

Onward (segment 30)

 

 

209

 

 

209

 

 

209

 

 

209

 

 

209

 

 

209

 

 

Duncanville Lateral (segment 90)

 

 

36

 

 

36

 

 

36

 

 

36

 

 

36

 

 

36

 

 

Dearmanville (segment 150)

 

 

355

 

 

355

 

 

355

 

 

355

 

 

355

 

 

355

 

 

 

White Castle (segment 340)

 

 

798

 

 

728

(70)

 

 

733

(65)

 

 

738

(60)

 

 

798

 

 

798

White Castle Compressor Station: Scheduled Unit Maintenance, Proj-5010-10 (11/23/2026 - 12/6/2026) White Castle Compressor Station: Scheduled Unit Maintenance, Proj-5010-6 (12/14/2026 - 12/18/2026) White Castle Compressor Station: Scheduled Unit Maintenance, Proj-5010-7 (12/7/2026 - 12/11/2026)

 

Sesh (segment 380)

 

 

500

 

 

500

 

 

500

 

 

500

 

 

500

 

 

500

 

 

Gwinville (segment 400)

 

 

234

 

 

234

 

 

234

 

 

234

 

 

234

 

 

234

 

 

Bay Springs (segment 420)

 

 

1,817

 

1702

(115)

 

1702

(115)

 

1702

(115)

 

1702

(115)

 

1702

(115)

Bay Springs Compressor Station: Scheduled Unit Maintenance, Proj-5216-1 (11/1/2026 - 3/31/2027)

 

Enterprise (segment 430)

 

 

2,450

 

2400

(50)

 

2400

(50)

 

2400

(50)

 

2400

(50)

 

2400

(50)

South Main line east of Enterprise: Unscheduled Pipeline Maintenance - CAO (11/1/2026 - 3/31/2027)

 

Ellerslie (segment 490)

 

 

1,663

 

1608

(55)

 

 

1,663

 

 

1,663

 

 

1,663

 

 

1,663

Thomaston Compressor Station: Scheduled Unit Maintenance, Proj-5272-5 (11/2/2026 - 12/6/2026)

 

South Atlanta (segment 510)

 

 

537

 

 

537

 

 

537

 

 

537

 

 

537

 

 

537

 

 

Thomaston East (segment 530)

 

 

900

 

 

900

 

 

900

 

 

900

 

 

900

 

 

900

 

 

South Georgia (segment 650)

 

 

143

 

 

143

 

 

143

 

 

143

 

 

143

 

 

143

 

This document is updated on a weekly basis and outage schedules/impacts are subject to change as the week progresses.

Dates posted on DART should be deemed correct in the event of conflicts between DART posted dates and dates on this report. The impacts sheet are based on steady-state hydraulic models assuming recent operating flows, conditions, and various unit outages.

 

 

 

 

 

 

-Restrictions to Primary In-Path transportation services may be necessary.

 

SNG - Outage Impact Report

 

 

-Restrictions to In-Path transportation services may be necessary.

 

January 2027 (updated 10/29/26)

 

 

-Restrictions to Interruptible and Out of Path transportation services may be necessary.

-No anticipated impact to transportation services.

 

Station / Seg

 

Est Nominal Design Capacity (Thousand Dth)

Week 1 (1/4 - 1/10)

Week 2 (1/11 - 1/17)

Week 3 (1/18 - 1/24)

Week 4 (1/25 - 1/31)

 

Primary Outage(s)

Est. Operational Capacity (Operational Impact) - Thousand Dth

 

Onward (segment 30)

 

 

209

 

 

209

 

 

209

 

 

209

 

 

209

 

 

Duncanville Lateral (segment 90)

 

 

36

 

 

36

 

 

36

 

 

36

 

 

36

 

 

Dearmanville (segment 150)

 

 

355

 

 

355

 

 

355

 

 

355

 

 

355

 

 

White Castle (segment 340)

 

 

798

 

 

798

 

 

798

 

 

798

 

 

798

 

 

Sesh (segment 380)

 

 

500

 

 

500

 

 

500

 

 

500

 

 

500

 

 

Gwinville (segment 400)

 

 

234

 

 

234

 

 

234

 

 

234

 

 

234

 

 

 

 

 

 

 

Bay Springs Compressor Station: Scheduled Unit Maintenance, Proj-5216-1 (11/1/2026 - 3/31/2027)

Bay Springs (segment 420)

1,817

1702

(115)

1702

(115)

1702

(115)

1702

(115)

 

 

 

 

 

 

 

South Main line east of Enterprise: Unscheduled Pipeline Maintenance - CAO (11/1/2026 - 3/31/2027)

Enterprise (segment 430)

2,450

2400

(50)

2400

(50)

2400

(50)

2400

(50)

 

 

Ellerslie (segment 490)

 

 

1,663

 

 

1,663

 

 

1,663

 

 

1,663

 

 

1,663

 

 

South Atlanta (segment 510)

 

 

537

 

 

537

 

 

537

 

 

537

 

 

537

 

 

Thomaston East (segment 530)

 

 

900

 

 

900

 

 

900

 

 

900

 

 

900

 

 

South Georgia (segment 650)

 

 

143

 

 

143

 

 

143

 

 

143

 

 

143

 

This document is updated on a weekly basis and outage schedules/impacts are subject to change as the week progresses.

Dates posted on DART should be deemed correct in the event of conflicts between DART posted dates and dates on this report.

The impacts sheet are based on steady-state hydraulic models assuming recent operating flows, conditions, and various unit outages.

 

 

 

 

 

 

-Restrictions to Primary In-Path transportation services may be necessary.

 

SNG - Outage Impact Report

 

 

-Restrictions to In-Path transportation services may be necessary.

 

February 2027 (updated 10/29/26)

 

 

-Restrictions to Interruptible and Out of Path transportation services may be necessary.

-No anticipated impact to transportation services.

 

Station / Seg

 

Est Nominal Design Capacity (Thousand Dth)

Week 1 (2/1 - 2/7)

Week 2 (2/8 - 2/14)

Week 3 (2/15 - 2/21)

Week 4 (2/22 - 2/28)

 

Primary Outage(s)

Est. Operational Capacity (Operational Impact) - Thousand Dth

 

Onward (segment 30)

 

 

209

 

 

209

 

 

209

 

 

209

 

 

209

 

 

Duncanville Lateral (segment 90)

 

 

36

 

 

36

 

 

36

 

 

36

 

 

36

 

 

Dearmanville (segment 150)

 

 

355

 

 

355

 

 

355

 

 

355

 

 

355

 

 

White Castle (segment 340)

 

 

798

 

 

798

 

 

798

 

 

798

 

 

798

 

 

Sesh (segment 380)

 

 

500

 

 

500

 

 

500

 

 

500

 

 

500

 

 

Gwinville (segment 400)

 

 

234

 

 

234

 

 

234

 

 

234

 

 

234

 

 

 

 

 

 

 

Bay Springs Compressor Station: Scheduled Unit Maintenance, Proj-5216-1 (11/1/2026 - 3/31/2027)

Bay Springs (segment 420)

1,817

1702

(115)

1702

(115)

1702

(115)

1702

(115)

 

 

 

 

 

 

 

South Main line east of Enterprise: Unscheduled Pipeline Maintenance - CAO (11/1/2026 - 3/31/2027)

Enterprise (segment 430)

2,450

2400

(50)

2400

(50)

2400

(50)

2400

(50)

 

 

Ellerslie (segment 490)

 

 

1,663

 

 

1,663

 

 

1,663

 

 

1,663

 

 

1,663

 

 

South Atlanta (segment 510)

 

 

537

 

 

537

 

 

537

 

 

537

 

 

537

 

 

Thomaston East (segment 530)

 

 

900

 

 

900

 

 

900

 

 

900

 

 

900

 

 

South Georgia (segment 650)

 

 

143

 

 

143

 

 

143

 

 

143

 

 

143

 

This document is updated on a weekly basis and outage schedules/impacts are subject to change as the week progresses.

Dates posted on DART should be deemed correct in the event of conflicts between DART posted dates and dates on this report.

The impacts sheet are based on steady-state hydraulic models assuming recent operating flows, conditions, and various unit outages.

TSP/TSP Name:  6900518-SOUTHERN NATURAL GAS CO. Critical: Y Notice Type Desc (1):  MAINTENANCE Notice Type Desc (2):  MAINTENANCE Notice Eff Date/Time:  10/29/2026 4:46:01PM Notice End Date/Time:  10/30/2026 9:00:00am Post Date/Time:  10/29/2026 4:46:01 PM Notice ID: 712600 Reqrd Rsp:  1 Rsp Date/Time:  10/29/2026 12:00:00 AM Notice Stat Desc:  INITIATE Prior Notice:  Subject:  Outage Impact Report
Notice Text:

 

 

 

 

 

 

 

 

-Restrictions to Primary In-Path transportation services may be necessary.

 

 

SNG - Outage Impact Report

 

 

 

 

-Restrictions to In-Path transportation services may be necessary.

 

 

Seven Day Forecast (updated 10/29/26)

 

 

 

-Restrictions to Interruptible and Out of Path transportation services may be necessary.

 

 

 

 

 

 

-No anticipated impact to transportation services.

 

 

Station / Seg

 

Est Nominal Design Capacity (Thousand Dth)

Monday (11/2)

Tuesday (11/3)

Wednesday (11/4)

Thursday (11/5)

Friday (11/6)

Saturday (11/7)

Sunday (11/8)

 

 

Primary Outage(s) that may Impact Throughput

Est. Operational Capacity (Operational Impact) - Thousand Dth

 

Onward (segment 30)

 

209

 

209

 

209

 

209

 

209

 

209

 

209

 

209

 

 

Duncanville Lateral (segment 90)

 

36

 

36

 

36

 

36

 

36

 

36

 

36

 

36

 

 

Dearmanville (segment 150)

 

355

 

335

(20)

 

335

(20)

 

335

(20)

 

335

(20)

 

355

 

355

 

355

Bell Mills Compressor Station: Scheduled Unit Maintenance Proj-4500-3 (11/2/2026 - 11/5/2026)

 

 

 

White Castle (segment 340)

 

 

 

798

 

 

 

738

(60)

 

 

 

548

(250)

 

 

 

673

(125)

 

 

 

673

(125)

 

 

 

673

(125)

 

 

 

738

(60)

 

 

 

738

(60)

Shadyside Compressor Station: Scheduled Station Maintenance Proj-5000 (11/3/2026)

Shadyside Compressor Station: Scheduled Unit Maintenance Proj-5000-2 (11/4/2026 - 11/6/2026)

Shadyside Compressor Station: Scheduled Unit Maintenance Proj-5000-4-5 (11/3/2026)

Shadyside Compressor Station: Scheduled Unit Maintenance Proj-5000-5 (11/1/2026 - 11/20/2026)

 

LA West Leg (segment 350)

 

798

 

733

(65)

 

733

(65)

 

733

(65)

 

733

(65)

 

733

(65)

 

733

(65)

 

733

(65)

Franklinton Compressor Station: Scheduled Unit Maintenance Proj-512215 (11/1/2026 - 11/8/2026)

 

Sesh (segment 380)

 

507

 

507

 

507

 

507

 

507

 

507

 

507

 

507

 

 

Gwinville (segment 400)

 

234

 

234

 

234

 

234

 

234

 

234

 

234

 

234

 

 

Bay Springs (segment 420)

 

1,817

 

1702

(115)

 

1702

(115)

 

1702

(115)

 

1702

(115)

 

1702

(115)

 

1702

(115)

 

1702

(115)

Bay Springs Compressor Station: Scheduled Unit Maintenance Proj-5216-1 (11/1/2026 - 3/31/2027)

 

Enterprise (segment 430)

 

2,450

 

2195

(255)

 

2195

(255)

 

2195

(255)

 

2195

(255)

 

2195

(255)

 

2195

(255)

 

2195

(255)

Enterprise Compressor Station: Scheduled Unit Maintenance Proj-5222-15 (11/1/2026 - 11/15/2026)

South Main line east of Enterprise: Unscheduled Pipeline Maintenance - CAO (11/1/2026 - 3/31/2027)

 

York

'ZONE 1/2 BOUNDARY'

(segment 440)

 

2,449

 

2194

(255)

 

2194

(255)

 

2194

(255)

 

2194

(255)

 

2194

(255)

 

2194

(255)

 

2194

(255)

York Compressor Station: Scheduled Unit Maintenance Proj-5230-1 (11/1/2026 - 11/15/2026)

 

Ellerslie (segment 490)

 

1,663

 

1608

(55)

 

1608

(55)

 

1608

(55)

 

1608

(55)

 

1608

(55)

 

1608

(55)

 

1608

(55)

Thomaston Compressor Station: Scheduled Unit Maintenance Proj-5272-5 (11/2/2026 - 12/6/2026)

 

South Atlanta (segment 510)

 

537

 

537

 

537

 

537

 

537

 

537

 

537

 

537

 

 

Thomaston East (segment 530)

 

900

 

900

 

900

 

900

 

900

 

900

 

900

 

900

 

 

Ocmulgee (segment 530)

 

801

 

721

(80)

 

721

(80)

 

721

(80)

 

721

(80)

 

721

(80)

 

721

(80)

 

721

(80)

Ocmulgee Compressor Station: Unscheduled Unit Outage Proj-5277-4 (11/1/2026 - 11/15/2026)

 

South Georgia (segment 650)

 

143

 

143

 

143

 

143

 

143

 

143

 

143

 

143

 

This document is updated on a weekly basis and outage schedules/impacts are subject to change as the week progresses. Dates posted on DART should be deemed correct in the event of conflicts between DART posted dates and dates on this report.

The impacts sheet are based on steady-state hydraulic models assuming recent operating flows, conditions, and various unit outages.


 

 

 

 

-Restrictions to Primary In-Path transportation services may be necessary.

 

SNG - Outage Impact Report

 

 

-Restrictions to In-Path transportation services may be necessary.

 

November 2026 (updated 10/29/26)

 

 

-Restrictions to Interruptible and Out of Path transportation services may be necessary.

-No anticipated impact to transportation services.

 

Station / Seg

 

Est Nominal Design Capacity (Thousand Dth)

Week 1 (11/2 - 11/8)

Week 2 (11/9 - 11/15)

Week 3 (11/16 - 11/22)

Week 4 (11/23 - 11/29)

 

Primary Outage(s)

Est. Operational Capacity (Operational Impact) - Thousand Dth

 

Onward (segment 30)

 

 

209

 

 

 

209

 

 

209

 

 

209

 

 

Duncanville Lateral (segment 90)

 

 

36

 

 

 

36

 

 

36

 

 

36

 

 

Dearmanville (segment 150)

 

 

355

 

 

 

355

 

 

355

 

 

355

 

 

White Castle (segment 340)

 

 

798

 

 

738

(60)

 

738

(60)

 

728

(70)

Shadyside Compressor Station: Scheduled Unit Maintenance, Proj-5000-5 (11/1/2026 - 11/20/2026) White Castle Compressor Station: Scheduled Unit Maintenance, Proj-5010-10 (11/23/2026 - 12/6/2026)

 

Sesh (segment 380)

 

 

507

 

 

 

507

 

 

507

 

 

507

 

 

Gwinville (segment 400)

 

 

234

 

 

63

(171)

 

 

234

 

 

234

Pickens Compressor Station: Scheduled Station Maintenance(valve), Proj-4125 (11/9/2026 - 11/10/2026)

 

Bay Springs (segment 420)

 

 

1,817

 

 

1702

(115)

 

1702

(115)

 

1702

(115)

Bay Springs Compressor Station: Scheduled Unit Maintenance, Proj-5216-1 (11/1/2026 - 3/31/2027)

 

Enterprise (segment 430)

 

 

2,450

 

 

2195

(255)

 

2400

(50)

 

2400

(50)

Enterprise Compressor Station: Scheduled Unit Maintenance, Proj-5222-15 (11/1/2026 - 11/15/2026) South Main line east of Enterprise: Unscheduled Pipeline Maintenance - CAO (11/1/2026 - 3/31/2027)

 

York

'ZONE 1/2 BOUNDARY'

(segment 440)

 

 

2,449

 

 

2194

(255)

 

 

2,449

 

 

2,449

York Compressor Station: Scheduled Unit Maintenance, Proj-5230-1 (11/1/2026 - 11/15/2026)

 

Ellerslie (segment 490)

 

 

1,663

 

 

1608

(55)

 

1608

(55)

 

1608

(55)

Thomaston Compressor Station: Scheduled Unit Maintenance, Proj-5272-5 (11/2/2026 - 12/6/2026)

 

South Atlanta (segment 510)

 

 

537

 

 

 

537

 

 

537

 

 

537

 

 

Thomaston East (segment 530)

 

 

900

 

 

 

900

 

 

900

 

 

900

 

 

Ocmulgee (segment 530)

 

 

801

 

 

721

(80)

 

 

801

 

 

801

Ocmulgee Compressor Station: Unscheduled Unit Outage, Proj-5277-4 (11/1/2026 - 11/15/2026)

 

South Georgia (segment 650)

 

 

143

 

 

 

143

 

 

143

 

 

143

 

This document is updated on a weekly basis and outage schedules/impacts are subject to change as the week progresses.

Dates posted on DART should be deemed correct in the event of conflicts between DART posted dates and dates on this report.

The impacts sheet are based on steady-state hydraulic models assuming recent operating flows, conditions, and various unit outages.

 

 

 

 

 

 

 

 

-Restrictions to Primary In-Path transportation services may be necessary.

 

 

SNG - Outage Impact Report

 

 

-Restrictions to In-Path transportation services may be necessary.

 

December 2026 (updated 10/29/26)

 

 

-Restrictions to Interruptible and Out of Path transportation services may be necessary.

 

 

 

 

-No anticipated impact to transportation services.

 

Station / Seg

 

Est Nominal Design Capacity (Thousand Dth)

Week 1 (11/30 - 12/6)

Week 2 (12/7 - 12/13)

Week 3 (12/14 - 12/20)

Week 4 (12/21 - 12/27)

Week 5 (12/28 - 1/3)

 

Primary Outage(s)

Est. Operational Capacity (Operational Impact) - Thousand Dth

 

Onward (segment 30)

 

 

209

 

 

209

 

 

209

 

 

209

 

 

209

 

 

209

 

 

Duncanville Lateral (segment 90)

 

 

36

 

 

36

 

 

36

 

 

36

 

 

36

 

 

36

 

 

Dearmanville (segment 150)

 

 

355

 

 

355

 

 

355

 

 

355

 

 

355

 

 

355

 

 

 

White Castle (segment 340)

 

 

798

 

 

728

(70)

 

 

733

(65)

 

 

738

(60)

 

 

798

 

 

798

White Castle Compressor Station: Scheduled Unit Maintenance, Proj-5010-10 (11/23/2026 - 12/6/2026) White Castle Compressor Station: Scheduled Unit Maintenance, Proj-5010-6 (12/14/2026 - 12/18/2026) White Castle Compressor Station: Scheduled Unit Maintenance, Proj-5010-7 (12/7/2026 - 12/11/2026)

 

Sesh (segment 380)

 

 

500

 

 

500

 

 

500

 

 

500

 

 

500

 

 

500

 

 

Gwinville (segment 400)

 

 

234

 

 

234

 

 

234

 

 

234

 

 

234

 

 

234

 

 

Bay Springs (segment 420)

 

 

1,817

 

1702

(115)

 

1702

(115)

 

1702

(115)

 

1702

(115)

 

1702

(115)

Bay Springs Compressor Station: Scheduled Unit Maintenance, Proj-5216-1 (11/1/2026 - 3/31/2027)

 

Enterprise (segment 430)

 

 

2,450

 

2400

(50)

 

2400

(50)

 

2400

(50)

 

2400

(50)

 

2400

(50)

South Main line east of Enterprise: Unscheduled Pipeline Maintenance - CAO (11/1/2026 - 3/31/2027)

 

Ellerslie (segment 490)

 

 

1,663

 

1608

(55)

 

 

1,663

 

 

1,663

 

 

1,663

 

 

1,663

Thomaston Compressor Station: Scheduled Unit Maintenance, Proj-5272-5 (11/2/2026 - 12/6/2026)

 

South Atlanta (segment 510)

 

 

537

 

 

537

 

 

537

 

 

537

 

 

537

 

 

537

 

 

Thomaston East (segment 530)

 

 

900

 

 

900

 

 

900

 

 

900

 

 

900

 

 

900

 

 

South Georgia (segment 650)

 

 

143

 

 

143

 

 

143

 

 

143

 

 

143

 

 

143

 

This document is updated on a weekly basis and outage schedules/impacts are subject to change as the week progresses.

Dates posted on DART should be deemed correct in the event of conflicts between DART posted dates and dates on this report. The impacts sheet are based on steady-state hydraulic models assuming recent operating flows, conditions, and various unit outages.

 

 

 

 

 

 

-Restrictions to Primary In-Path transportation services may be necessary.

 

SNG - Outage Impact Report

 

 

-Restrictions to In-Path transportation services may be necessary.

 

January 2027 (updated 10/29/26)

 

 

-Restrictions to Interruptible and Out of Path transportation services may be necessary.

-No anticipated impact to transportation services.

 

Station / Seg

 

Est Nominal Design Capacity (Thousand Dth)

Week 1 (1/4 - 1/10)

Week 2 (1/11 - 1/17)

Week 3 (1/18 - 1/24)

Week 4 (1/25 - 1/31)

 

Primary Outage(s)

Est. Operational Capacity (Operational Impact) - Thousand Dth

 

Onward (segment 30)

 

 

209

 

 

209

 

 

209

 

 

209

 

 

209

 

 

Duncanville Lateral (segment 90)

 

 

36

 

 

36

 

 

36

 

 

36

 

 

36

 

 

Dearmanville (segment 150)

 

 

355

 

 

355

 

 

355

 

 

355

 

 

355

 

 

White Castle (segment 340)

 

 

798

 

 

798

 

 

798

 

 

798

 

 

798

 

 

Sesh (segment 380)

 

 

500

 

 

500

 

 

500

 

 

500

 

 

500

 

 

Gwinville (segment 400)

 

 

234

 

 

234

 

 

234

 

 

234

 

 

234

 

 

 

 

 

 

 

Bay Springs Compressor Station: Scheduled Unit Maintenance, Proj-5216-1 (11/1/2026 - 3/31/2027)

Bay Springs (segment 420)

1,817

1702

(115)

1702

(115)

1702

(115)

1702

(115)

 

 

 

 

 

 

 

South Main line east of Enterprise: Unscheduled Pipeline Maintenance - CAO (11/1/2026 - 3/31/2027)

Enterprise (segment 430)

2,450

2400

(50)

2400

(50)

2400

(50)

2400

(50)

 

 

Ellerslie (segment 490)

 

 

1,663

 

 

1,663

 

 

1,663

 

 

1,663

 

 

1,663

 

 

South Atlanta (segment 510)

 

 

537

 

 

537

 

 

537

 

 

537

 

 

537

 

 

Thomaston East (segment 530)

 

 

900

 

 

900

 

 

900

 

 

900

 

 

900

 

 

South Georgia (segment 650)

 

 

143

 

 

143

 

 

143

 

 

143

 

 

143

 

This document is updated on a weekly basis and outage schedules/impacts are subject to change as the week progresses.

Dates posted on DART should be deemed correct in the event of conflicts between DART posted dates and dates on this report.

The impacts sheet are based on steady-state hydraulic models assuming recent operating flows, conditions, and various unit outages.

 

 

 

 

 

 

-Restrictions to Primary In-Path transportation services may be necessary.

 

SNG - Outage Impact Report

 

 

-Restrictions to In-Path transportation services may be necessary.

 

February 2027 (updated 10/29/26)

 

 

-Restrictions to Interruptible and Out of Path transportation services may be necessary.

-No anticipated impact to transportation services.

 

Station / Seg

 

Est Nominal Design Capacity (Thousand Dth)

Week 1 (2/1 - 2/7)

Week 2 (2/8 - 2/14)

Week 3 (2/15 - 2/21)

Week 4 (2/22 - 2/28)

 

Primary Outage(s)

Est. Operational Capacity (Operational Impact) - Thousand Dth

 

Onward (segment 30)

 

 

209

 

 

209

 

 

209

 

 

209

 

 

209

 

 

Duncanville Lateral (segment 90)

 

 

36

 

 

36

 

 

36

 

 

36

 

 

36

 

 

Dearmanville (segment 150)

 

 

355

 

 

355

 

 

355

 

 

355

 

 

355

 

 

White Castle (segment 340)

 

 

798

 

 

798

 

 

798

 

 

798

 

 

798

 

 

Sesh (segment 380)

 

 

500

 

 

500

 

 

500

 

 

500

 

 

500

 

 

Gwinville (segment 400)

 

 

234

 

 

234

 

 

234

 

 

234

 

 

234

 

 

 

 

 

 

 

Bay Springs Compressor Station: Scheduled Unit Maintenance, Proj-5216-1 (11/1/2026 - 3/31/2027)

Bay Springs (segment 420)

1,817

1702

(115)

1702

(115)

1702

(115)

1702

(115)

 

 

 

 

 

 

 

South Main line east of Enterprise: Unscheduled Pipeline Maintenance - CAO (11/1/2026 - 3/31/2027)

Enterprise (segment 430)

2,450

2400

(50)

2400

(50)

2400

(50)

2400

(50)

 

 

Ellerslie (segment 490)

 

 

1,663

 

 

1,663

 

 

1,663

 

 

1,663

 

 

1,663

 

 

South Atlanta (segment 510)

 

 

537

 

 

537

 

 

537

 

 

537

 

 

537

 

 

Thomaston East (segment 530)

 

 

900

 

 

900

 

 

900

 

 

900

 

 

900

 

 

South Georgia (segment 650)

 

 

143

 

 

143

 

 

143

 

 

143

 

 

143

 

This document is updated on a weekly basis and outage schedules/impacts are subject to change as the week progresses.

Dates posted on DART should be deemed correct in the event of conflicts between DART posted dates and dates on this report.

The impacts sheet are based on steady-state hydraulic models assuming recent operating flows, conditions, and various unit outages.