Capacity Constraint
Iroquois Gas Transmission System 12h ago
All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
Capacity Constraint
Effective Timely Cycle, Gas
Day November 13, 2026, nominations are sealed from all increases
through the following locations:
-
MLV-14
-
Brookfield Interconnect with Algonquin Gas Transmission.
In addition, the following
capacity has been reduced:
-
MLV-14 – Interruptible nominations forward-haul through mainline
valve 14 are reduced by 100%.
- Brookfield Interconnect – Park, Interruptible
and Secondary receipt nominations at the Brookfield Interconnect are reduced by
100%.
If you have any further
questions, please contact the Iroquois Scheduling or Gas Control Group.
End date 11/14/2026 09:00 AM CCT
Capacity Constraint
Effective Timely Cycle, Gas
Day November 13, 2026, nominations are sealed from all increases
through the following locations:
-
MLV-14
-
Brookfield Interconnect with Algonquin Gas Transmission.
In addition, the following
capacity has been reduced:
-
MLV-14 – Interruptible nominations forward-haul through mainline
valve 14 are reduced by 100%.
- Brookfield Interconnect – Park, Interruptible
and Secondary receipt nominations at the Brookfield Interconnect are reduced by
100%.
If you have any further
questions, please contact the Iroquois Scheduling or Gas Control Group.
End date 11/14/2026 09:00 AM CCT